Which drawing did your estimator price?

Website edition prepared November 20, 2026. The archive date is a reading order; the source news date is listed below.

It is Thursday afternoon and a sheet-metal contractor is about to send a price. An addendum lands with a revised drawing. One estimator has the new file open, another is working from a printout, and a supplier’s number is based on the original quantities. The immediate problem is figuring out which parts of the estimate still hold up.

Illustrative process for this article

Integrations are scoped and tested separately.

What the SickKids announcement tells us

On November 19, 2026, SickKids reported Ontario’s approval of its Ambulatory Care Tower in Toronto, part of the hospital’s Project Horizon redevelopment. The tower is intended to house most outpatient services. Approval is the milestone SickKids announced. Access to tender documents, scope and deadlines would need to be verified with the relevant procurement issuer. The contractor example here is fictional and independent of the hospital project.

Official source: SickKids, November 19, 2026

Keep the change next to the number

Imagine the new drawing changes the dimensions of a duct run. The estimate still shows the old quantity, but another change on the same sheet may only affect the installation sequence. Start with the addendum number, the old and new drawing references, and the affected line item. That gives the estimator a single place to record whether the quantity, the installation allowance or the supplier’s coverage needs another look.

The email that announced the change can arrive separately from the documents. Connect the email and the actual drawing to the same revision record. Preserve the supplier quote along with the date and version it covered. When a second supplier replies on the new revision, the team can compare the two quotes with that distinction visible. The original quote stays available as evidence of what was known before the change.

Give the estimator something they can verify

An assistant can pull sheet numbers, revision dates and references to changed scope into a review queue. If it cannot read a note or tell whether an area applies to this trade, it can flag the exact page for someone to check. The estimator opens the source, confirms the impact and records the decision. If a supplier needs to revise its price, the follow-up carries the drawing number the supplier is being asked to use.

In a small firm, the same person might estimate, buy material and submit the bid. A short handoff still helps. By the time that person returns to the estimate they should be able to see which revision the number uses, what was confirmed and what still needs a reply. An unanswered supplier question can sit beside the affected line with an owner and a due time.

Try it on a closed estimate

Choose a completed estimate with an addendum that changed something your team priced. Give a colleague the original estimate, the addendum and the supplier email. Ask them to trace one line back to the right drawing and explain what changed. If it takes several searches or a call to the original estimator, start with that handoff. ProgressorAI can help map it using the document and estimating tools your team already works in.