The shop is ready to cut the frame. A site photo arrives showing the tape measure at 892 mm. The drawing called for 915 mm. If the installer texts the new number to one person, the crew at the saw may still have the old sheet open when the work starts.

Illustrative process for this article

Integrations are scoped and tested separately.

An old structure brings its own conditions

On November 12, 2026, Niagara Parks and its partners marked the start of on-site construction at the former Toronto Power Generating Station in Niagara Falls, Ontario. Niagara Parks described a private investment of more than C$350 million by Toronto Power Hotel Inc. to restore and redevelop the historic property. It expects substantial completion in 2029. The example below uses a fictional renovation and is independent of that project.

Official source: Niagara Parks, November 12, 2026

Show what was measured

Imagine a contractor preparing a custom frame for an existing opening. The site lead records the location, finished surfaces measured, method, unit and time, then attaches a photograph that identifies the opening. A tape reading near the floor may differ from the reading farther up. Capture both where the frame fit depends on them. Attach the approved drawing revision the team was about to use. The reviewer can see why the shop paused and which dimensions need confirmation.

A workflow can surface the 23 mm difference on the fabrication ticket and place the item on hold. The assistant can prepare a request for clarification with the photo and drawing attached. The site lead checks that the right opening was measured and the designer or other designated reviewer confirms the dimension or issues a revised detail. Another opening on the same floor can keep moving if its ticket and approval are separate.

Send one decision back to the shop and the site

Once the change is approved, record the new requirement and the person who authorized it. Give the shop the approved revision beside the job number and mark the previous work instruction superseded. The site lead can see the same updated ticket when scheduling the installation. If a part has already been made, give the shop a way to record that fact before somebody orders another one. The review can then account for the material already committed.

When the reviewer needs another measurement, show the request on the same ticket with the person responsible and the time it is needed. The site can add the second reading without replacing the original photo. That gives the shop a record of how the instruction changed.

For a first test, use a completed job with a known field change. Ask a fabricator and a site lead to find the same approved number from the job record. Include a photograph with an unreadable tape and another from the wrong opening. Check that both people can explain which job waits, what evidence is missing and who can release it. ProgressorAI can help map that exchange between the site report and the shop’s work order.